Thrilling changes are coming to our high school! Starting Spring Break 2025, we're adding a modern 8-plex that includes innovative classrooms, a science lab for hands-on discovery, an economics room with a kitchen, and a collaborative seminar room. Spanning 4,500 square feet, this new space will be ready to inspire our students by September 2025. Together, we are building a brighter future for learning!
The project involves the construction of a modular 8-plex, which will consist of four double-wide learning spaces arranged around a central hallway. These spaces will include the projects listed below. The modular units were purchased used and are being renovated for installation in the 2025 school year.
At the beginning of the 2023 school year in September, our school proudly welcomed two new high school portables to accommodate our growing population. To enhance the campus experience, a beautiful roof has been constructed between the new portables and the existing ones, creating a cohesive and inviting outdoor space for students and staff to connect and thrive.
In October 2023, the school extended the gravel parking lot to ease congestion and improve parking for everyone. This expansion is a step toward addressing current challenges and brings hope for a permanent parking solution in the future.
Insert your content. Try to limit your content to a maximum of 2 - 3 sentences so that you don’t lose your readers interest. A great way to break up large amounts of text is to create additional blocks.